Garden dimensions
—sq metres
Zone split
Zone rates are applied automatically based on garden length. Zone 1 is always the most expensive — terrace, level changes, direct house connections. Costs reduce with distance from the house.
Quality level
Construction features
Premium additions
Fixed-cost items supplied and installed by specialists. Includes supply, delivery, base preparation and installation. Excludes ongoing running costs and VAT.
Estimated construction cost
Enter garden dimensions to generate an estimate.